Measure the active display area and state the unit
A 3 × 2 metre active display has 6 square metres of area, approximately 64.6 square feet. Multiply area by a rate only after checking that the rate uses the same unit. One square metre is approximately 10.764 square feet.
For a rate R in PKR per square foot, this screen costs approximately 64.6 × R for the stated supply scope. That calculation is not a turnkey quotation. Controllers, cabinets, structure and installation may be separate.
Specify whether dimensions describe the active image or the complete structure. Cabinet dimensions can require a small adjustment to the final screen size.
Define the model before comparing prices
Give the supplier the city, indoor or outdoor location, closest viewing distance, content type, mounting photos and intended operating hours. Request the actual model, pixel pitch, active resolution, brightness, refresh rate, service access and power requirements.
Pixel pitch is the distance between neighbouring pixels, measured in millimetres. For a regular square grid, approximate pixel density is (1,000 ÷ pitch in mm) squared, in pixels per square metre. P2.5 therefore has approximately 160,000 pixels per square metre.
A finer pitch does not establish weather resistance or a better fit for every room. Confirm the product construction, IP rating, brightness and operating conditions. Test actual text and video at the closest viewing position.
Ask for separate supply and installation items
- Display supply: modules, cabinets, power supplies, receiving cards and the specified spare parts.
- Control: sending equipment, processor, source switching, software and any recurring licence costs.
- Structure and electrical work: mounting frame, structural assessment, service access, circuits, earthing and site-specific preparation.
- Installation: labour, lifting equipment, access, commissioning, calibration and operator training.
- Delivery and commercial terms: transport, applicable taxes, payment milestones, exclusions and the quotation expiry date.
- Warranty and support: coverage period, parts and labour, response arrangements, travel charges and optional maintenance.
Compare the same screen, unit and scope
Place quotations side by side using the same active area, model, pitch and scope. A supply-only rate cannot be compared directly with an installed project total. Ask each supplier to identify excluded work and substitutions.
Do not use the former example budgets on this site as approved rates. The review found conflicting units and project totals; those examples have been withdrawn from the static guide pending approved quotations.
Use the commercial pricing page to compare pitch options and request an itemised quotation. Keep the quotation reference, date, unit and validity with the decision record.
Include maintenance in the buying decision
Confirm access for module replacement and cleaning before the frame is designed. Ask which spare parts are held, whether replacement batches need colour calibration and who maintains the content system.
A hardware warranty and a maintenance agreement cover different work. Request the written warranty, exclusions, parts availability, response terms and recurring costs for the quoted equipment.
For outdoor installations, have the supplier identify the structural, electrical and permission requirements for the actual site. Confirm responsibilities before placing an order.