Retail · Karachi · 2024

A 6 × 3 m P2.5 anchor wall that pulled foot traffic deeper into the mall.

Front-of-store LED video wall for a national retail chain at a Karachi mall. Specified for close viewing distance, calibrated to the daylight wash from the atrium skylight, and connected to the brand’s in-house content rotation.

Client
National Retail Chain
Industry
Retail
City
Karachi
Year
2024
Screen size
6 m × 3 m (≈ 18 sqm)
Summary

A national retail chain wanted a statement entrance for its newest Karachi flagship — visible from the main mall thoroughfare and capable of running broadcast-quality brand films, product reveals, and live campaigns without looking washed-out under the atrium skylight. SMDSOLUTIONS specified, supplied, installed, and calibrated a P2.5 indoor LED video wall on the storefront facade and integrated it with the chain’s content-management workflow.

The challenge

What the client needed.

  • Existing LCD video-wall array had visible bezels that broke up brand films at close viewing distance.
  • Atrium skylight pushed mid-day ambient brightness above what a typical 600-nit indoor wall could handle without looking flat.
  • Storefront depth was shallow — any solution needed to mount inside a 90 mm cavity without intruding on the customer flow line.
  • Content team needed to push campaigns from head office without on-site IT involvement for every refresh.
The solution

What we delivered.

  • P2.5 indoor SMD video wall, 6 m × 3 m, 18 sqm of live image area with seamless cabinet-to-cabinet alignment.
  • 900-nit module bin selected and re-calibrated to 750 nits operating brightness to handle the skylight wash without shortening lifespan.
  • Slim 75 mm front-maintenance cabinets — fits inside the existing storefront cavity with room for ventilation.
  • Novastar processor and a managed content-feed running over the chain’s VPN; head-office team pushes playlists directly.
  • Hand-over training for the in-store visual-merchandising team on day-to-day operation and basic fault checks.
Specifications

As built — the actual numbers.

Pixel pitch
P2.5 indoor SMD
Screen size
6 m × 3 m (≈ 18 sqm)
Resolution
2,400 × 1,200 px
Brightness
900 nits peak / 750 nits calibrated
Refresh rate
3,840 Hz
Modules
288 modules across 18 cabinets
Processor
Novastar VX1000 with content-feed integration
IP rating
IP31 (indoor)
Cabinet depth
75 mm front-maintenance
Install duration
4 days on-site + 1 day calibration
Project gallery

From bare wall to live screen.

Image references for this project. Selected captures available on request — we don't publish high-resolution photography of client sites without explicit permission.

Storefront wall framed inside the existing 90 mm cavity
Cabinet-by-cabinet seam alignment in progress
Power and signal harness routed behind the back panel
Calibration in progress — uniformity sweep at operating brightness
Retail brand campaign loop running live on opening day
Atrium skylight wash test at midday
Head-office content-management dashboard preview
Front-maintenance access during a routine service window
Timeline

How the project actually ran.

PHASE 01

Site survey & spec

Viewing distances, ambient light, structural cavity, and content-feed network surveyed. P2.5 specified after a same-pitch reference visit.

PHASE 02

Engineering sign-off

Power, structural, content-feed, and HVAC plans agreed with the mall facilities team and the retail chain’s store-development office.

PHASE 03

Supply & staging

18 cabinets, 288 modules, controllers, and structure pre-tested at our facility before the night-time site move.

PHASE 04

Mount, wire & calibrate

4-day install during night windows to keep the mall trading. Calibration sweep finished day 5 ahead of opening.

PHASE 05

Hand-over & support

VM team trained on day-to-day; ongoing 24-hour SLA in place with on-site spare modules.

Outcomes

What changed after go-live.

Outcomes are stated as the client described them — we don't fabricate metrics, and we don't publish numbers a client hasn't signed off.

RESULT 01

Storefront pull-in measurably improved versus the previous LCD array — anecdotal feedback from the chain’s VM team cited dwell-time and stop-rate gains.

RESULT 02

Zero unplanned downtime over the first 14 months of operation.

RESULT 03

Content rotation handled fully by head office — zero on-site IT escalations for content updates.

RESULT 04

Calibration drift after 12 months held within ±3% on white balance, well inside the chain’s visual-standards tolerance.

The install was tight and on-spec. Trading hours were never disrupted and the wall has held its calibration through the first year.

Project Lead, National Retail Chain
Related services

Services used on this project.

Related cities

We work across Pakistan.

Project FAQs

Specific questions answered for this project.

  • Around 4 days on-site for mounting and wiring, plus a 5th day for calibration and uniformity correction. We worked night windows to keep the mall trading during the day.
Plan a similar build

Want a project like this for your retail site in Karachi?

Send us your use case, location, and rough screen size — we'll come back with a realistic specification and budget range within one working day.