A 5 × 2 m P1.5 conference wall built for documentary-grade text legibility.
Front-of-room LED video wall for a federal government body in Islamabad. Specified at P1.5 to keep dense documents and dashboards legible from the chair-rail at 2 m, calibrated for the room’s controlled tungsten lighting, and integrated with the building’s secure AV switching.
- Client
- Federal Government Body
- Industry
- Government
- City
- Islamabad
- Year
- 2024
- Screen size
- 5 m × 2 m (≈ 10 sqm)
A federal government body replaced its ageing projector-and-screen setup in a senior conference room with a fine-pitch LED wall capable of displaying full government documents, mapping dashboards, and live video conferences without losing text legibility. SMDSOLUTIONS specified a P1.5 wall, integrated it with the existing closed-loop AV switching, and delivered a 6-day install inside an active facility.
What the client needed.
- Documents and mapping dashboards were rendered unreadable on the legacy projector when room lights were on.
- Senior officials sit within 2 m of the screen — pixel pitch had to disappear at that distance.
- Government IT policy required closed-loop AV — no public network exposure, no over-the-air content push.
- Install had to happen inside an active facility with controlled access windows and full clean-up between days.
What we delivered.
- P1.5 indoor SMD wall, 5 m × 2 m, ≈ 10 sqm with full HD-plus native resolution and 3,840 Hz refresh.
- Closed-loop signal chain — a hardened Crestron-style switcher, no internet bridge, no remote-access firmware.
- 600-nit operating brightness paired with the room’s tungsten lighting for natural skin tones during videoconferencing.
- Cabinets pre-staged off-site so the on-site time was strictly install, wire, calibrate — no unboxing inside the secure space.
- Hand-over package included a printed run-book and an on-site spare-module stock kept inside the facility.
As built — the actual numbers.
From bare wall to live screen.
Image references for this project. Selected captures available on request — we don't publish high-resolution photography of client sites without explicit permission.
How the project actually ran.
Security & spec coordination
IT, security, and facilities offices ran a joint spec review. Closed-loop AV requirement was locked before any hardware was sourced.
Engineering & approvals
Power, structural, and AV-switching plans approved through the body’s formal change-control process.
Off-site staging
Cabinets, processor, and switcher pre-tested and burned-in at our facility before sealed transport.
Controlled-access install
6 days inside the facility under access-controlled windows with daily clean-up and tool inventory.
Hand-over & training
Operations team trained on day-to-day plus the printed run-book; spare-module stock kept in the building.
What changed after go-live.
Outcomes are stated as the client described them — we don't fabricate metrics, and we don't publish numbers a client hasn't signed off.
Document and dashboard legibility moved from "needs lights off" to "always on" — meeting cadence improved.
Closed-loop AV passed the body’s internal IT review on first attempt with no waivers requested.
Zero unscheduled downtime over the first 18 months of operation.
On-site spare-module stock kept mean-time-to-repair under 30 minutes for the two minor module faults seen in year one.
They worked inside our access protocols without slipping the schedule. The wall has been on every working day since hand-over.
Services used on this project.
Specific questions answered for this project.
- Officials sit within 2 m of the wall and routinely read full A4-equivalent documents on screen. P1.5 keeps body text legible at that range; P2.5 would have visible pixel structure on body copy.